google-site-verification: google352095ad40f9714e.html

Architecture

  01. Annex H   
  02. Mikawa Art Center  
  03. Green Field Edge         
  04. Hut Y  
  05. Clinic S (unbuild)    
  06. Annex F     
  07. Village H(unbuild)
  08. Village UM  
  09. Farm O(2023-) 
  10. Museum H Entrance(2024-)
  11. Building T(2024-)

Furniture

  12. L’animale
  13. K Museum’s Chair

Exhibition Space
 
  14. Group Show TMAM 2020 
  15. The Tale of Architecture     
  16. alternative greenhouse
  17. Assembridge Nagoya
  18. Group Show N/BFMA+
  19. iichiko design at KHM
  20. be/behave/become(2023-)
  21. exhibition SO (2024-)
 
  22. Architecture for guidance (2024-)

Fieldwork
 
  23. alternative greenhouse
  24. Signs of Mobility 
  25. Constructing Assembly  
  26. Material Fieldwork in Okazaki  
  27. N Olympic Research Collective

Assemble
 
  27. be/behave/become(2023-) 
  28. Material Learning Farm(2023-)  
  29. Parallel Sessions 2021
  30. Parallel Projections 2019
  31. Aichi Triennale 2019  
  32. N Olympic Research
  33. Art Play Ground      
  34. IAMAS Community Archive
  35. Rehearsal T/N  
  36. Okazaki Design Chalet

Text / Books
 
  37. Assembly that creates an entrance for viewing  
  38. Windouw Research Institute 
  39. KenchikuTouron2022  
  40AP Kyoto
  41. Urban Theory of Pandemic  
  42Pararell Sessions 2021  
  43. Flagmental Image Game  
  44. Retro typing
  45. Architects of the Year    
  46. Tokyo Kenchiku Collection
  47. master’s thesis    

Previous works

  48. Eagle Woods House
  49. Make Alternative Space
  50. Calavan of MA-DO


Mark

  

Annex F



2021 completed / Minokamo city     photo:ToLoLo Studio

美濃加茂市に建つ戸建住宅の玄関ホールとLDKの部分的な改修計画です。

改修計画を設計者としてサポートする中で全体の意匠計画、部分的な制作・発注図を作成し工事の監理を工務店と共に行いました。

床以外の要素をどのように調律していくか?
室内において、見落とされがちな天井に優位性を持たせ、室内装飾・調度の計画ルールを発見していくプロセスでした。
 

This is a partial renovation plan for the entrance hall and LDK of a detached house in Gifu,Minokamo City.

This project began with a meeting at the site, where the subfloor had already been constructed and the flooring materials had already been ordered and delivered. I had been proceeding with separate orders for construction work as needed in between housework, but I received a request saying,  

How do we tune elements other than the floor? Regarding the interior, it was a process of discovering and proceeding with planning rules for interior decoration and furnishings, giving priority to the ceiling, which is often overlooked.